MMV Studio

Custom wardrobe interiors in Torrevieja

We can assist you inEspañolEnglishDeutschРусский

Furniture planned for the room you actually have

An existing wardrobe interior can sometimes be improved without replacing the doors. In Torrevieja we first check the sides and the opening: a pull-out tray is useless if a hinge traps it inside.

Ask about your address in TorreviejaHomes and working spaces
Designed for your space

Design what sits behind the door

Rails, shelves and baskets follow real garments. We also check whether sides and back can carry the new fittings.

01

Sound carcass

We inspect alignment and strength of existing sides.

02

Clear opening

Pull-outs are tested with the front open.

03

Daily clothes close

Frequent items stay at a comfortable height.

04

Useful top shelf

Less-used things can occupy upper space.

Our process

From the first estimate to your final check

The measurements and the agreed specification turn an initial price range into a final quote. Design and project work are free when you commission us to make the furniture to that project.

  1. A first price range

    Photographs, rough sizes and your address let us discuss the scope. The figure remains provisional until we measure.

  2. Survey at the property

    We check the actual openings, services, wall lines and the route for bringing the pieces in.

  3. Design where needed

    If plans are needed, we develop them after the survey. The design and project are free when you commission us to make the furniture to that project.

  4. The detailed quote

    We set out the agreed layout, boards, fronts, fittings, delivery and any installation included in the order.

  5. Your approval and deposit

    You can check the full proposal before accepting it. Production begins after the agreed advance payment.

  6. Workshop manufacture

    The pieces are made to the approved measurements and specifications, with the agreed hardware prepared for fitting.

  7. Delivery and fitting

    We carry out the transport and installation specified in your order, then adjust the parts we have fitted.

  8. Walk-through together

    We test doors and drawers with you, record any outstanding details and close the job once the agreed result is confirmed.

Profile image for Lorena Peña
Lorena PeñaYour contact in Torrevieja
Your project starts here

Tell me what you want to change at home.

I'm Lorena Peña. You don't need to know the technical name for the furniture. Describe the problem in your own words and add a photo if you can; I'll help you work out the next step.

No obligation. Rough measurements are enough to get started.

Interior decisions

Four checks for a useful interior

Layout follows garments and the real opening.

01

Daily items

Keep them between waist and shoulder where possible.

02

Seasonal items

Use upper space visited less often.

03

Footwear

Separate it from clean clothes with airflow.

04

Large items

Cases and boxes need measured spaces.

From problem to drawing

Examples of internal arrangements

Possible situations that explain the design, not claims of completed work.

Interior for daily clothing
Example 01

Fast morning routine

Everyday clothes can be reached without moving other items.

Situation
Count what is worn each week.
Design response
Place this group on reachable rails and drawers.
Check before making
Check it can be taken out with doors open.
Shared wardrobe interior
Example 02

Storage for two

One front can hide different storage habits.

Situation
Each person lists hanging and folded clothes.
Design response
Allocate space by volume rather than equal halves.
Check before making
Drawers can be opened at the same time.
Adjustable wardrobe interior
Example 03

Changing needs

Adjustable shelving avoids remaking a whole unit.

Situation
Identify heights likely to change.
Design response
Choose supports that let shelves move safely.
Check before making
Keep fixings out of unsuitable load areas.
Six configurations

Different fittings for different needs

Placement matters more than the accessory name.

OptionWhere it helpsCheck before deciding
Double rail Many short garments Reach to the upper one
Tall hanging Coats and dresses Maximum garment length
Drawers Small folded items Door clearance
Shelves Jumpers and boxes Reachable depth
Shoe trays Numerous pairs Height and air
Top shelf Seasonal luggage Weight and access
Written scope

Interiors and hardware in writing

A partial or complete refit can be priced.

01

Inventory

Quantities and garment sizes are recorded.

02

Existing carcass

Depth, condition and square are checked.

03

Rails

Height and supports suit expected loads.

04

Drawers

Runners are tested against open doors.

05

Shelves

Clear height and support are specified.

06

Fitting

The complete layout is installed and tested.

Removal of old furniture, painting and electrical work are priced separately when requested.

From drawing to fitting

From old wardrobe to new layout

A site check shows what can be retained.

How the work proceeds

  1. 01
    First estimate

    Photographs, rough dimensions and a list of needs help us examine the idea.

  2. 02
    Site measurement

    We check the room, obstructions and the route for bringing pieces in.

  3. 03
    Design and quotation

    If a design is needed, we prepare it; the design is free when its manufacture is ordered. After scope and deposit are agreed, we book production.

  4. 04
    Fitting and review

    We install, adjust doors and drawers and inspect the result with you.

What changes the price

Drawer count

Each pull-out adds front, runner and adjustment.

Support

An old interior may need strengthening.

Lighting

Power and service access are required.

Accessories

Trouser racks or baskets are costed individually.

Before the workshop · Torrevieja

Measure the Torrevieja home before making

The specific address matters for the opening and delivery route, rather than because each neighbourhood has its own wardrobe style.

01

Existing recesses

A column, dropped ceiling or skirting can alter the cut list.

02

Property access

Floor, lift and stair turns influence panel size.

03

How the home is used

Daily living and occasional stays may call for different interiors.

Details you can verify

Details to verify before ordering

The proposal states materials, included work and fitting conditions. Any change is explained before production.

01

Scope

Manufacture, transport, fitting and exclusions are written down.

02

Contact

Questions and documents can be sent through the published contact channels.

03

Measurement

Final dimensions follow a site visit or an expressly agreed validation.

04

Project lead

The team coordinates choices, measurement and fitting.

05

Warranty

Conditions and care for supplied parts accompany the order.

Profile image for Lorena Peña
Lorena PeñaYour contact in Torrevieja
The next step

Let's talk through the details.

If an option has caught your eye, send it with a photo of your home. I'll explain what information we need to consider whether it suits your space.

Scope and terms are confirmed before you place an order.

Practical answers

Questions about reorganising a wardrobe

Can the existing carcass be used?+

Only after sides, fixings and dimensions have been checked.

Will drawers work behind sliding doors?+

Yes, if the overlap leaves room for each one to extend.

What should we send?+

Pictures with doors open, rough dimensions and a list of belongings.

Your project starts here

Send the details you have

We will review your enquiry and contact you to clarify the scope and next steps. Sending this form does not place an order.

  1. 01 Initial reply and feasibility review
  2. 02 Suggested next step
  3. 03 A detailed quotation antes de fabricar
Ask on WhatsApp

No obligation. Approximate measurements are enough for an initial conversation.

Project enquiry

Plan your project

Answer only what you know. At the end you will have a summary ready to request a project estimate.

Step 1 of 6 · Project

What do you want to design?

Choose the closest option. You can add details at the end.

Project type
Step 1 of 6